Duna Aszfalt are improving productivity and quality using BIM technology and work methods by Trimble to get a more effective workflow from design to construction.
"We want a more controlled and direct data flow from design to construction" says Ervin Bakos, head of design and modeling team at Duna Aszfalt. Introducing the BIM concept in their daily work has led to significant gains regarding productivity, quality, and efficiency for Duna Aszfalt Zrt, one of Hungary's biggest local contractors. They have chosen Trimble Quadri software solution as their main tool to reach a full BIM, level 3 work process. Quadri combines constructible data; GIS, BIM and process data in one common data environment being shared with open data formats.
"The most important thing for us as a contractor is that we are closing the gap between the construction site and the office by using a common data environment like Quadri. We have also improved the analysis of technical challenges in the field, so we address them early because they cause any problems at the construction phase. And that is valuable because we avoid stops in the production." Read the story
Let's join the hybrid meeting dedicated on BIM Infra, InfraBIM Open Lyon january 10-12, 2022: registration
Other news
Fully custom data processing pipelines
Build custom tools for processing reality data with Pointscene’s new API
Allplan Bridge 2022: The evolution of precast bridge modelin...
Discover a dedicated modeling solution to generate accurate geometry easily and quickly
BIM Infra, a quality approach according to setec
The benefits of BIM Infrastructure are numerous. For a long time, BIM Infrastructure has r...
Infrakit’s owners’ view: schedule, costs and quality
The work environment for which Infrakit was designed for is quite extensive and diverse. M...